Welcome to your 2365 210 Communicating with others on site
1.
What is a person who would maintain a 240v circuit called?
2.
What is the process where people in a meeting discuss items and come to an agreement?
3.
Which one of the following jobs would a structural engineer carry out?
4.
An architect wishing particular design expertise would probably employ?
5.
The two key pieces of information required when completing a day work sheet are?
6.
The prevention of disease is part of the responsibility of which of the following construction site visitors?
7.
A new employee in a company would normally be given which of the following documents?
8.
Probably the most efficient and fastest means of communicating technical information would be by?
9.
When dealing with a customer who is speaking English but it is their second language, what should you do?
10.
Lack of cooperation with other trades and contractors during an electrical installation could lead to?
11.
Fitting instructions for a component will normally be found in?
12.
To check the ongoing progress of a contract, the contracts manager would use?
13.
Access to goods and services is covered under which of the following Acts?
14.
If a customer has a special learning difficulties which one of the following should you do?
15.
What is the role of the customer?
16.
The right to a fair trial is covered under which of the following Acts?
17.
The main purpose of the manufacturers data is to provide installation information and?
18.
A room measures 4.25 metres long, what would it measure on a drawing scaled at 1:20?
19.
If there was a dispute between an employee and an employer, who could be used in the discussions?
20.
What is an engineer who installs Pipe Push fittings into domestic/commercial premises is called?